spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer
Planning Community Toolbox
USACE Castle
spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer
Toolbox Home Link to Planner's Library Link to Project Delivery Link to People Link to Tools Link to Processes Link to Training Link to Search Link to Contact Us spacer
spacer
spacer Description spacer spacer

Red divider graphic

Categories
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic

 
Red divider graphic

Training Resources - Planning Webinars

Life Safety Risk Indicator


20 October 2022

    This webinar provided an overview of the Life Safety Risk Indicator (LSRI). In an effort to develop a consistent way to recommend projects that warrant funding based on risk to life safety, USACE has developed the LSRI tool, which provides a screening-level, relative representation of the life risk (average annual life loss) that would be reduced if a given structural or non-structural flood damage reduction project was constructed. The LSRI is intended to serve as a budget tool to prioritize studies and projects starting with the FY25 budget development process. The LSRI builds off of and replaces the Life Safety Hazard Index (LSHI) tool by incorporating not just consequence information, but also likelihood of the consequences. Presenter Jason Needham (Consequence Specialist, Risk Management Center) described the LSRI methodology and introduced the web-based LSRI tool and how to use it.

  • PowerPoint Presentation
  • Video
  • Q&A Summary

     Corps Castle Items are restricted to US Army Corps of Engineers, CAC required.