spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer
Planning Community Toolbox
USACE Castle
spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer
Toolbox Home Link to Planner's Library Link to SMART Guide Link to Project Delivery Link to People Link to Tools Link to Processes Link to Training Link to Search Link to Contact Us spacer
spacer
spacer Description spacer spacer

Red divider graphic

SMART planning is:
     S: Specific
    M: Measurable
    A: Attainable
    R: Risk Informed
    T: Timely

Red divider graphic

SMART Guide
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
 
ball graphic
ball graphic
ball graphic
 
 
 
 
 
 
 
 
 
 
ball graphic
ball graphic

Red divider graphic

What's New on the SMART Guide
ball graphic
ball graphic
ball graphic
ball graphic
Tips, Tools & Techniques

Last updated: 5 February 2020

Example Risk Registers

  • Example Urban Ecosystem Restoration Risk Register (PDF) - updated in June 2014 to better align with the language and approach of the Cost Schedule Risk Register
  • Example Wetland Ecosystem Restoration Risk Register (PDF) - Urban ecosystem restoration on an existing flood control project, early in the study process. NOTE: This risk register is provided as an example. It should NOT be used for any other study except as an example of how other real studies characterized and chose to manage risks associated with the study. Please do not cut and paste information.
  • Sample Draft ER Risk Register 3 (XLS) - Wetland restoration with high resource significance, early in the study process. NOTE: The format of this risk register does not follow the standard template so please discuss pros and cons of this approach with your vertical team prior to using it. This risk register is provided as an example. It should NOT be used for any other study except as an example of how other real studies characterized and chose to manage risks associated with the study. Please do not cut and paste information.
  • Example HSDR Risk Register for St. Johns County, FL (PDF) - This example Risk Register was developed to prepare for vertical team alignment on St. Johns County, FL, Hurricane and Storm Damage Reduction (HSDR) study’s 3x3 scoping. NOTE: This risk register is provided as an example. It should NOT be used for any other study except as an example of how other studies characterized and chose to manage risks associated with the study. Please do not cut and paste information.
  • Example HSDR Risk Register for St. Lucie County, FL (PDF) - This example Risk Register was developed to prepare for vertical team alignment on St. Lucie County, FL, Shore Protection Project study’s 3x3 scoping. NOTE: This risk register is provided as an example. It should NOT be used for any other study except as an example of how other studies characterized and chose to manage risks associated with the study. Please do not cut and paste information.
  • Example Coastal Hurricane Storm Damage Reduction study Risk Register, prior to the TSP milestone (PDF). NOTE: This risk register is provided as an example. It should NOT be used for any other study except as an example of how other real studies characterized and chose to manage risks associated with the study. Please do not cut and paste information.
  • Example Deep Draft Navigation Risk Register (PDF) - Example of a risk register developed by a Deep Draft Navigation study. NOTE: This risk register is provided as an example. It should NOT be used for any other study except as an example of how other real studies characterized and chose to manage risks associated with the study. Please do not cut and paste information