This webinar provided an overview of Civil Works Cost Engineering policy (Engineer Regulation 1110-2-1302), cost
classifications, and the recent Policy Clarification Guidance on Design Maturity and how it applies to feasibility studies and
projects in the construction phase. Presenter Mukesh Kumar (Cost Engineering Community of Practice Leader, HQUSACE)
also discussed the Total Project Cost Summary (TPCS) and what it means for a construction schedule.
Items below are restricted to US Army Corps of Engineers, CAC required.
Engineer Regulation 1110-2-1302: Civil Works Cost Engineering This Engineering Regulation (ER) provides policy, guidance, and procedures for cost engineering responsibilities for all Civil Works projects assigned to the U.S. Army Corps of Engineers (USACE). This regulation supersedes ER 1110-2-1302, dated 15 September 2008.