spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer
Planning Community Toolbox
USACE Castle
spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer
Toolbox Home Link to Planner's Library Link to SMART Guide Link to Project Delivery Link to People Link to Tools Link to Processes Link to Training Link to Search Link to Contact Us spacer
spacer
spacer Description spacer spacer

Red divider graphic

Categories
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
ball graphic
 
 
 
 
 
 
 
 
ball graphic

 
Red divider graphic

ball graphic
Planning Guidance: Flood Risk Management
 

Sort by: Year | Title

Engineer Circulars (ECs)

  • Engineer Circular 1110-2-6070: Comprehensive Evaluation of Project Datum (2009 Expiration: unlisted)
    This circular provides guidance for a comprehensive evaluation of vertical datum on flood control, shore protection, hurricane protection, and navigation projects.

    Engineering and Construction Bulletins

  • Engineering and Construction Bulletin 2017-15: Managed Overtopping of Levee Systems (2017)
    The U.S. Army Corps of Engineers (USACE) will use this directive and guidance for commands responsible for planning, design, construction, and operation and maintenance of civil works projects. The procedures are general in nature and can be applied to any phase of study, as directed by Engineer Regulation (ER) 1110-2-1150. The level of detail in the overtopping analysis will depend on the study phase. This document is applicable for all USACE riverine levee and floodwall systems. This Engineering and Construction Bulletin (ECB) provides an interim update to expired technical guidance Engineer Technical Letter (ETL) 1110-2-299 and provides a methodology for configuring the engineered capacity exceedance related to flood overtopping at a specific location or locations along the levee system. This guidance does not address overtopping of the entire system on those occasions when the overall system capacity is exceeded. Content of this ECB supersedes previous guidance on the subject of overtopping of levee systems and will be incorporated into an Engineer Manual (EM) in the future.

    Economic Guidance Memoranda (EGMs)

  • Economic Guidance Memorandum 00-03: Current Normalized Prices (2000)
    This memorandum provides FY 2000 normalized prices.
  • Economic Guidance Memorandum 00-04: National Flood Insurance Program Operating Costs (2000)
    FY 2000 NFIP operating costs.
  • Economic Guidance Memorandum 01-04: National Flood Insurance Program Operating Costs, Fiscal Year 2001 (2000)
    Summary of NFIP operating costs from FY 1973 through FY 2001.
  • Economic Guidance Memorandum 01-05: Current Normalized Prices, Fiscal Year 2000 (2000)
    Normalized prices for years 1995-2000, at state and national level.
  • Economic Guidance Memorandum 02-01: Current Normalized Prices (2001)
    Provides data used in the economic evaluation of Corps of Engineers projects affecting agriculture.
  • Economic Guidance Memorandum 02-05: National Flood Insurance Program Operating Costs, Fiscal Year 2002 (2002)
    NFIP operating costs from FY 1973 to FY 2002.
  • Economic Guidance Memorandum 03-01: Current Normalized Prices (2002)
    This memorandum provides normalized prices for years 1997-2002, at both state and national levels.
  • Economic Guidance Memorandum 03-03: National Flood Insurance Program Operating Costs, Fiscal Year 2003 (2003)
    This memorandum provides FY 2003 NFIP operating costs.
  • Economic Guidance Memorandum 04-04: National Flood Insurance Program Operating Costs, Fiscal Year 2004 (2004)
    This memorandum provides NFIP operating costs from FY 1973 to FY 2004.
  • Economic Guidance Memorandum 04-05: Current Normalized Prices (2004)
    Notice of the availability of normalized agricultural prices from the USDA.
  • Economic Guidance Memorandum 05-02: Current Normalized Prices (2004)
    Current (2004) Normalized Prices.
  • Economic Guidance Memorandum 05-07: National Flood Insurance Program Operating Costs, Fiscal Year 2005 (2004)
    FY 2005 NFIP operating costs.
  • Economic Guidance Memorandum 06-01: Current Normalized Prices (2005)
    Current (Oct 2005) normalized prices.
  • Economic Guidance Memorandum 06-04: National Flood Insurance Program Operating Costs, Fiscal Year 2006 (2006)
    FY 2006 NFIP operating costs.
  • Economic Guidance Memorandum 07-02: Current Normalized Prices (2006)
    Current (Nov 2006) normalized prices.
  • Economic Guidance Memorandum 08-03: Current Normalized Prices (2007)
    Current (Oct 2007) normalized prices.
  • Economic Guidance Memorandum 09-02: Current Normalized Prices, Fiscal Year 2009 (2008)
    This memorandum provides a data link used in the economic evaluation of Corps of Engineers projects affecting agriculture.
  • Economic Guidance Memorandum 09-04: Generic Depth-Damage Relationships for Vehicles (2009)
    Guidance for generic vehicle depth-damage curves for flood damage reduction studies.
  • Economic Guidance Memorandum 10-02: Current Normalized Prices (2009)
    This memorandum provides current (Oct 2009) normalized prices.
  • Economic Guidance Memorandum 98-04: National Flood Insurance Program Operating Costs (1998)
    This memorandum provides FY 1998 NFIP operating costs. It also shows NFIP costs since 1972.
  • Economic Guidance Memorandum 99-04: National Flood Insurance Program Operating Costs (1999)
    This memorandum provides FY 1999 NFIP operating costs.

    Engineer Pamphlets (EPs)

  • Engineer Pamphlet 1110-2-8: Explaining Flood Risk (1992)
    Engineer Pamphlet improves the technical expert's skills in communicating information about flood risk to local officials and the public.
  • Engineer Pamphlet 1110-2-9: Hydrologic Engineering Study Design (1994)
    Engineer Pamphlet describes activities necessary to design and prepare a Hydrologic Engineering Study for a Corps water resource investigation.
  • Engineer Pamphlet 1165-2-1, Chapter 13: Flood Damage Reduction (1999)
    Engineer Pamphlet provides basic background on flood plain management, including structural and nonstructural measures. Digest of Water Resources Policies and Authorities
  • Engineer Pamphlet 1165-2-1, Chapter 17: Recreation (1999)
    Engineer Pamphlet discusses federal recreation policy and philosophy, different types of recreation projects, project evaluation, and project finance. Digest of Water Resources Policies and Authorities
  • Engineer Pamphlet 1165-2-314: Flood Proofing Regulations (1995 Update needed)
    Engineer Pamphlet specifies flood-proofing measures and techniques that can be followed to regulate construction in riverine flood hazard areas.

    Engineer Regulations (ERs)

  • Engineer Regulation 1100-2-8162: Incorporating Sea Level Change in Civil Work Programs (2013)
    This Regulation provides guidance for incorporating the direct and indirect physical effects of projected future sea level change across the project life cycle in managing, planning, engineering, designing, constructing, operating, and maintaining USACE projects and systems of projects.
  • Engineer Regulation 1105-2-100: Planning Guidance Notebook, Appendix E, Civil Works Mission and Evaluation Procedures (2000)
  • Engineer Regulation 1110-2-1403: Engineering and Design Studies By Coastal, Hydraulic, and Hydrologic Facilities and Others (1998)
    This regulation prescribes the policy and procedure for approval and technical supervision of coastal, hydraulic, and hydrologic studies related to planning, design, construction, and operation of projects.
  • Engineer Regulation 1110-2-8160: Policies for Referencing Project Elevation Grades to Nationwide Vertical Datum (2009)
    This regulation provides guidance for proper and accurately referenced materials for flood forecasting, inundation modeling, flood insurance rate maps, navigation charting, and topographic mapping.
  • Engineer Regulation 1110-8-2(FR): Inflow Design Floods for Dams and Reservoirs (1991)
    This regulation sets forth hydrologic engineering requirements for selecting and accommodating Inflow Design Floods (IDF) for dams and reservoirs.
  • Engineer Regulation 1130-2-406: Project Operation - Shoreline Management at Civil Works Projects (1990)
    This regulation provides policy and guidance on management of shorelines of Civil Works projects where 36 CFR Part 327 is applicable.
  • Engineer Regulation 1130-2-530: Project Operation - Flood Control Operations and Maintenance Policies (1996)
    This regulation establishes the policy for the operation and maintenance (O&M) of USACE flood control and related structures at civil works water resource projects and of USACE-built flood protection projects operated and maintained by non-Federal sponsors.
  • Engineer Regulation 1150-2-302: Local Cooperation - Annual Report on Local Cooperation Agreements (RCS: DAEN-CWO-44) (1981)
    This regulation states the procedure for reporting requirements of Section 221 of the Flood Control Act of 1970 (P.L. 91-611).
  • Engineer Regulation 1165-2-111: Water Resources Policies and Authorities - Corps of Engineers Activities Under the Small Reclamation Projects Act of 1956, As Amended (1982)
    This regulation provides guidance regarding Corps of Engineers assistance to applicants for loans of projects with a flood control potential.
  • Engineer Regulation 1165-2-117: Water Resources Policies and Authorities - Responsibility for Costs of Improved Standards in Highway and Housing Relocations (1978)
    This regulation summarizes policy and procedures for identifying the costs of meeting improved standards when highways and housing are relocated due to construction of civil works projects.
  • Engineer Regulation 1165-2-121: Water Resources Policies and Authorities - Flood Control Cost-Sharing Requirements Under the Ability-to-Pay Provision-Section 103(M) of PL 99-662 (1989)
    This regulation gives instruction on implementation of Section 103(M) as it applies to flood control projects.
  • Engineer Regulation 1165-2-123: Water Resources Policies and Authorities - Single-Owner Situations (1992)
    This regulation provides policy guidance regarding Corps interests in civil works projects that would directly serve a single entity.
  • Engineer Regulation 1165-2-21: Water Resources Policies and Authorities - Flood Damage Reduction Measures in Urban Areas (1980)
    This regulation provides policy and guidance for participation in urban flood damage reduction projects.
  • Engineer Regulation 1165-2-26: Water Resources Policies and Authorities, Implementation and Executive Order, Engineer Regulation 11988 on Flood Plain Management. (1984)
    This regulation sets guidance for USACE implementation of Order 11988, Floodplain Management, as it pertains to civil works projects in design and construction.
  • Engineer Regulation 1165-2-27: Establishment of Wetland Areas in Connection with Dredging (1989)
    This regulation provides guidance for the establishment of wetland areas.
  • Engineer Regulation 1165-2-29: Water Resources Policies and Authorities - General Credit for Flood Control (1987)
    This regulation establishes guidelines and procedures for application of Section 104 of Public Law 99-662.

    Institute for Water Resources

  • Agricultural Flood Control Benefits and Land Values (1971)
    This report is designed to present in some detail the results of successfully applying a land value approach using a multiple linear regression technique to two study areas. The bulk of the monograph is not directed to analyzing the utility of the approach per se, although the strengths and weaknesses are reviewed. The main concern is with a rather detailed exposition of the statistical analysis of areas in the Wabash and Missouri River Basins. In this respect it is written primarily for use at the field levels of the Corps to serve as a guide to the use of the approach in terms of the types of data required, the form of the data for use in the regression model, and the interpretation of the estimated regression model.
  • Analysis of Alternative Procedures for the Evaluation of Agricultural Flood Control Benefits (1971)
    This report is devoted to evaluating alternative methodologies to the frequency damage procedure for estimating agricultural crop flood control benefits. The Economic Research Service Regional Linear Programming model has been extended to the case of project analysis. The RLP model operates in the same way as a basin-wide firm and estimates the change in production costs (out of pocket cost) as flood protection (and drainage) measures are provided. Efficiency benefits are equal to decreases in production costs, since output is held constant. Critical assumptions and several major empirical problems encountered during the study are discussed. Finally, Part IV is a synopsis of the utility of the land value approach, the regional linear programming approach, and the frequency-damage approach.
  • Assessment of the Economic Benefits from Flood Damage Mitigation by Relocation and Evacuation (1985)
    The object of this research was to assess the current Corps procedures used in the economic evaluation of flood plain relocation and evacuation plans for flood damage mitigation. Based on this assessment, the report offers a theoretically sound framework to evaluate the NED benefits from evacuation and relocation plans.

    Guidance Memos

  • Civil Works Policy Memorandum (CWPM) 15-001: Policy for Cost Management for Coastal and Hurricane Storm Damage Reduction Projects Involving Sand Placement (2015)
    This policy memorandum establishes the criteria in determining maximum project cost limits for coastal and hurricane storm damage reduction projects involving the placement of sand, sometimes referred to as beach nourishment or shore protection projects.
  • Federal Emergency Management Agency (FEMA)/U.S. Army Corps of Engineers (USACE) Joint Actions on Planning for Flood risk Management Projects (2012)

    Planning Bulletins

  • Planning Bulletin 2019-04: Incorporating Life Safety into Flood and Coastal Storm Risk Management Studies (2019)
    This Planning Bulletin provides information on the use of life safety in the planning process. Risks to human life are a fundamental component of all facets of flood and coastal storm risk management and must receive explicit consideration throughout the planning process. The bulletin augments, but does not supersede, the procedures in Engineer Regulation 1105-2-100, Planning Guidance Notebook and Engineer Regulation 1105-2-101, Risk Assessment for Flood Risk Management Studies. This document applies to all flood and coastal storm risk management feasibility studies, including those conducted under the Continuing Authorities Program and studies conducted by non-federal interests under Section 203 of WRDA 2986, as amended. Note: the POC for the Dam and Levee Senior Oversight Groups is Brad Arcement, MVK.

    Policy and Special Studies Program

  • Empirical Studies of the Effect of Flood Risk on Housing Prices (1998)


  •